A transmission line is essential to deliver the energy generated by the project to where it is needed.
The project will connect to NSW’s electricity network via a switching station linked to the existing 132kV transmission line.
This will require construction of approximately 2.4 km of new 132kV overhead line and a 132 kV switching yard.